The Wednesday Grounds & Maintenance Crew

Ground Maintenance update (Click on pictures for more)

28 October 2026

It is a good idea to have flexible plans for Wednesday work.

The SKYex Wednesday Crew arrived this morning to a sorry looking dugout in need of repair, especially as there would be a match this evening.

The crew dropped everything to work on interim repairs.

See before and after below.

July 2026

Since last July, the expanded use of the site has increased the ongoing maintenance, repairs and refurbishments that the volunteer Wednesday crew take on.

The type of work undertaken this year includes:

Stand and Lounge

Upgraded and extended the kit room
Improved lighting in work areas

Repositioned tunnel lighting
Moving contents elsewhere when rooms have been repurposed
Pipe lagging in the plant room to meet with council heat omission regulations
Refitting door handles of dressing rooms and office
Robust chain fixtures to keep the doors open during operating hours


Ground:
In readiness for the new season:

Extensive renovations of the dugouts including fixing the Perspex of the side panels
Cleaning turnstiles, preparing the goal posts, strimming the perimeters and weeding
Pitch marking and repairs
Washing out and preparing bins
Refitting the side gate by the turnstiles


Outside elsewhere
Unblocked drains using rods

Tidying and litter picking due to increased use of car park and ground, clearing the hinterland car park, filling in pot holes


It all takes teamwork.
July 2025
The last six months’ activity has been maintenance focussed. Increased use of the ground and facilities has inevitably led the usual Wednesday work to be on a larger scale including but not limited to remedial repairs, substantial rubbish clearing and litter removal extended to beyond the boundaries.
.
Actions and projects for the new season have centred on:
.
Preparing the goal posts
Further repairs to the dugouts
Pitch preparation – fertilising and marking
Works to comply with FA regulation requirements
Tarmac repairs surrounding the pitch
Painting and cleaning turnstiles
Improvements to the announcer’s area (aka the Warn Bros Studio)
Relocation of PA supply from the Warren Suite to the main building
Enhancing the washroom facilities
New mirrors for the Lounge toilets
Irrigation system examination
.
Never a dull moment in SKYex world.
December 2024
Here are the activities that the Wednesday Crew have undertaken this year:
Main pitch
Detailed weather (wind) proofing for the home dugout
Ongoing weather affected remedial work to the away dugout
Repainted all the toilet blocks
Fencing repairs
PA speaker wiring repaired and realigned
Pitch marking
Pitch repairs
Machinery maintenance
Realignment of gate E for easier use
All-weather surface
Floodlight repairs
Reducing vegetation around the perimeter for easier access
Dugouts repairs
New goals assembled
Fencing repairs including hundreds of bolts tightened
Perimeter sponsor signs reattached
Stand and Bar
Shelving made from spare material for the plant room to house various tools and equipment
Preparation of the bar – cleaning; moving furniture; moving equipment from the old bar
Beer lines cleaning
New hand dryers, door closers and baby changing facilities added to the bar toilets
Toilet blocks and changing rooms cleaned
Rerouting the supply cable to the PA equipment
Seats cleaned
Kit washing facilities created in new wash room
Other Areas
Heating and additional lights for the new turnstiles
Roof repairs to the old changing rooms
Clearing the old office
Grass cutting, weeding and strimming
Old programmes and books sorted
Emptying the bins in all areas
Recycling of tins and plastic bottles
There is never a light Wednesday
Happy Christmas to you all
July 2024

Derrick and the Wednesday Crew getting the SKYex ready for our first home friendly of the 2024/25 campaign against Hampton & Richmond.

May 2024

When the home match against Gosport Borough was surprisingly called off, the Wednesday Crew looked to mitigate any future last-minute decisions about the tunnel entrance/exit.

The offending area was strengthened and re-turfed, successfully enduring some challenging weather until the end of the season and beyond. 

December 2023
True to his word, a member of the Wednesday Crew sourced and installed this eye-catching mirror from his 50-50 winnings for the Ladies toilet near to the club shop
November 2023
Peter from the Wednesday Crew has come up with a clever idea to minimise the flooding near the away turnstiles.

Those who are asked to use Exit C on rainy days will hopefully see the benefit.

October 2023
Making a pair of previously owned dugout shelters match ready
July 2023
Getting ready for the new season
July 2022
You may have noticed towards the end of the past season a new disabled toilet block appearing next to the existing toilet facilities. Whilst the block comes pre-fitted, the Wednesday Crew have spent many weeks preparing the site and completing the installation.

This called for a variety of skills and therefore a variety of bodies!

Before the unit could be moved into place the site had to be cleared, levelled and have footing blocks cemented in place.

Sewage drainage and water connections also had to be in place.

Once in situ all the connections had to be made and tested.

The new yellow ramp and handrail came next along with some fine tuning of the layout of the internal fittings to enable ease of movement within the toilet for a wheelchair user. Luckily John was on hand to guide the crew.

There is still a bit of work required to make good tarmac around the unit but hopefully this new facility is a huge improvement from the temporary “Porta loo” previously in its place.

January/February 2022
Notwithstanding bitterly cold mornings, torrential rain and a global pandemic, the Wednesday crew have been continuing their ongoing battle against blocked gullies, overflowing drains and a never ending deluge of litter.

The drains and gullies outside the away turnstiles continue to be liable to flooding after heavy rain. The soak away is regularly pumped out in an attempt to minimise the impact on matchdays. One of our party has been known to disappear down the exposed drains in an attempt to get to the ‘bottom’ of the problem.

The gullies surrounding the pitch often fill with mud which allows the weeds to grow and impedes the pitch drainage. Quite an undertaking to keep these clear … and it’s a long way around that pitch!

The last few weeks have seen many of the crew covered in mud after an all out effort to clear the drainage gully outside the changing rooms. Years of mud and debris were cleared out with most of it being transferred to the hands, face and clothing of those involved and taken home as a souvenir.

And finally with so many home games coming up spare a thought for those that step up and clean up after each match.

No easy task and I’m sure you can imagine the variety of rubbish that passes through our nice new club coloured bins. This all creates a lovely ‘soup’ in the bottom of each receptacle so last week each bin was hosed out and cleaned… not a a pleasant job at all

31st August 2021
The wait for football back at the SkyEx may have seemed like an eternity but there still didn’t seem to be enough weeks left to tick off the essential work required around the ground before the big kick off.

Luckily we’ve had some new faces join the Wednesday Maintenance team and with everyone rolling up their sleeves (and trousers for those heading down the drains) we got there.

No Wednesday is ever quite the same and the pictures show a good example of the variety of tasks to be tackled. Unfortunately the weeds haven’t been furloughed, so many a week has been spent attacking these in the car park , around the pitch and along the entrance to the ground. Over-flowing drains outside the ‘Away’ turnstiles is an ongoing and continuing problem despite being pumped dry and all the drainage gullies cleared. Without doubt one of the most essential tasks is the cleaning of the beer pipes in the bar – we now have a resident ‘expert’! With a new league sponsor updated signage around the pitch and at the entrance has been put in place. The stand has been swept and the litter cleared – and hopefully we can keep it that way with the help of the newly acquired bins in the club colours and sporting the Hayes & Yeading badge. Even the goal posts have been cleaned and painted.

With such a big site there’s always work to do, but with the new recruits we are now running with optimal numbers in the team. If anyone wants to help in the future don’t hesitate to contact the club and when a resource hungry task comes along you’ll be the first to hear the rally cry!

20th May 2021
Over the coming weeks and months, we’ll use the Club’s website to show some examples of both recent and current work.

A great example of teamwork, where everyone got involved was the external refurbishment of the main toilet block. This was completed in the Pre COVID era ahead of the start of the 2020/21 season, but with so few games played since then you may have missed it! This involved rubbing down and preparation of both the roof and sides. Coating the roof with a specialised sealant and a good couple of coats of durable paint on the sides …. and making sure the “Ladies” and “Gents” signs were put back on the correct doors!

Just in case you’ve forgotten the state it was in here are a few before, during and after pictures.

If anybody has some spare time, or just wants to get out of the house, the team can be found at the ground most Wednesday mornings, feel free to come along and lend a hand, or two.