The Wednesday Grounds & Maintenance Crew










Ground Maintenance update (Click on pictures for more)
28 October 2026
It is a good idea to have flexible plans for Wednesday work.
The SKYex Wednesday Crew arrived this morning to a sorry looking dugout in need of repair, especially as there would be a match this evening.
The crew dropped everything to work on interim repairs.
See before and after below.
July 2026
Since last July, the expanded use of the site has increased the ongoing maintenance, repairs and refurbishments that the volunteer Wednesday crew take on.
The type of work undertaken this year includes:
Stand and Lounge
Upgraded and extended the kit room
Improved lighting in work areas
Repositioned tunnel lighting
Moving contents elsewhere when rooms have been repurposed
Pipe lagging in the plant room to meet with council heat omission regulations
Refitting door handles of dressing rooms and office
Robust chain fixtures to keep the doors open during operating hours
Ground: In readiness for the new season:
Extensive renovations of the dugouts including fixing the Perspex of the side panels
Cleaning turnstiles, preparing the goal posts, strimming the perimeters and weeding
Pitch marking and repairs
Washing out and preparing bins
Refitting the side gate by the turnstiles
Outside elsewhere
Unblocked drains using rods
Tidying and litter picking due to increased use of car park and ground, clearing the hinterland car park, filling in pot holes
It all takes teamwork.
July 2025
December 2024
July 2024
Derrick and the Wednesday Crew getting the SKYex ready for our first home friendly of the 2024/25 campaign against Hampton & Richmond.
May 2024
When the home match against Gosport Borough was surprisingly called off, the Wednesday Crew looked to mitigate any future last-minute decisions about the tunnel entrance/exit.
The offending area was strengthened and re-turfed, successfully enduring some challenging weather until the end of the season and beyond.
December 2023
November 2023
Those who are asked to use Exit C on rainy days will hopefully see the benefit.
October 2023
July 2023
July 2022
This called for a variety of skills and therefore a variety of bodies!
Before the unit could be moved into place the site had to be cleared, levelled and have footing blocks cemented in place.
Sewage drainage and water connections also had to be in place.
Once in situ all the connections had to be made and tested.
The new yellow ramp and handrail came next along with some fine tuning of the layout of the internal fittings to enable ease of movement within the toilet for a wheelchair user. Luckily John was on hand to guide the crew.
There is still a bit of work required to make good tarmac around the unit but hopefully this new facility is a huge improvement from the temporary “Porta loo” previously in its place.
January/February 2022
The drains and gullies outside the away turnstiles continue to be liable to flooding after heavy rain. The soak away is regularly pumped out in an attempt to minimise the impact on matchdays. One of our party has been known to disappear down the exposed drains in an attempt to get to the ‘bottom’ of the problem.
The gullies surrounding the pitch often fill with mud which allows the weeds to grow and impedes the pitch drainage. Quite an undertaking to keep these clear … and it’s a long way around that pitch!
The last few weeks have seen many of the crew covered in mud after an all out effort to clear the drainage gully outside the changing rooms. Years of mud and debris were cleared out with most of it being transferred to the hands, face and clothing of those involved and taken home as a souvenir.
And finally with so many home games coming up spare a thought for those that step up and clean up after each match.
No easy task and I’m sure you can imagine the variety of rubbish that passes through our nice new club coloured bins. This all creates a lovely ‘soup’ in the bottom of each receptacle so last week each bin was hosed out and cleaned… not a a pleasant job at all
31st August 2021
Luckily we’ve had some new faces join the Wednesday Maintenance team and with everyone rolling up their sleeves (and trousers for those heading down the drains) we got there.
No Wednesday is ever quite the same and the pictures show a good example of the variety of tasks to be tackled. Unfortunately the weeds haven’t been furloughed, so many a week has been spent attacking these in the car park , around the pitch and along the entrance to the ground. Over-flowing drains outside the ‘Away’ turnstiles is an ongoing and continuing problem despite being pumped dry and all the drainage gullies cleared. Without doubt one of the most essential tasks is the cleaning of the beer pipes in the bar – we now have a resident ‘expert’! With a new league sponsor updated signage around the pitch and at the entrance has been put in place. The stand has been swept and the litter cleared – and hopefully we can keep it that way with the help of the newly acquired bins in the club colours and sporting the Hayes & Yeading badge. Even the goal posts have been cleaned and painted.
With such a big site there’s always work to do, but with the new recruits we are now running with optimal numbers in the team. If anyone wants to help in the future don’t hesitate to contact the club and when a resource hungry task comes along you’ll be the first to hear the rally cry!
20th May 2021
A great example of teamwork, where everyone got involved was the external refurbishment of the main toilet block. This was completed in the Pre COVID era ahead of the start of the 2020/21 season, but with so few games played since then you may have missed it! This involved rubbing down and preparation of both the roof and sides. Coating the roof with a specialised sealant and a good couple of coats of durable paint on the sides …. and making sure the “Ladies” and “Gents” signs were put back on the correct doors!
Just in case you’ve forgotten the state it was in here are a few before, during and after pictures.
If anybody has some spare time, or just wants to get out of the house, the team can be found at the ground most Wednesday mornings, feel free to come along and lend a hand, or two.